UL AWM 3321 150℃ 600V XLPE Insulated LSZH Hookup Wire
Rated Voltage: 600V
Rated Temperature: 150ºC
Insulation Material: XLPE
Conductor: Tinned or Bare, Stranded or Solid Copper
Reference Standard: UL758, UL1581, C22.2 No.210
Uniform insulation thickness of wire to ensure easy stripping and cutting.
For internal wiring of electronic and electrical equipment and appliance, PV inverter, new energy, motors, ballasts, solenoids, engine, power modules, etc.
Conductor | Insulation | Max. Cond. Resistance at 20°C (Ω/km) | |||
AWG | Construction (No./mm) | Diameter (mm) | Thickness (mm) | Diameter (mm) | |
30 | 7/0.10 | 0.30 | 0.80 | 1.90 | 381.00 |
28 | 7/0.127 | 0.38 | 0.80 | 1.98 | 239.00 |
26 | 7/0.16 | 0.48 | 0.80 | 2.08 | 150.00 |
24 | 11/0.16 | 0.61 | 0.80 | 2.21 | 94.20 |
22 | 17/0.16 | 0.76 | 0.80 | 2.36 | 59.40 |
20 | 26/0.16 | 0.94 | 0.80 | 2.54 | 37.40 |
18 | 41/0.16 | 1.18 | 0.80 | 2.80 | 23.50 |
16 | 26/0.254 | 1.50 | 0.80 | 3.10 | 14.70 |
14 | 41/0.254 | 1.90 | 0.80 | 3.70 | 9.25 |
12 | 65/0.254 | 2.40 | 0.80 | 4.00 | 5.75 |
10 | 105/0.254 | 3.00 | 0.80 | 4.60 | 3.62 |
8 | 169/0.254 | 3.81 | 1.20 | 6.21 | 2.23 |
6 | 7/38/0.254 | 5.40 | 1.20 | 7.80 | 1.41 |
※The above datasheet is for reference only, please refer to the final specification. |
Q1: Are you a manufacturer?
A1: Yes, we are a manufacturer located in Dongguan, Guangdong, China. We can provide OEM/ODM service for customers around the world.
Q2: Can I get a free sample?
A2: Yes, we can provide the existing items' samples without charge but freight collected. If there is any special samples requirement, please contact us for more details.
Q3: Is the quality of your product guaranteed?
A3: Yes, our workshop are equipped with Brand-new and Advanced Machines and Test Equipment. Besides, our worker are Professional Technicians. Our production process and quality are in strictly accordance with the international standards and customers' requirements.
Q4: What is the order production lead time?
A4: It depends on the quantity and specification. Generally, the order production lead time is around 10-15 working days.
UL AWM 3321 150℃ 600V XLPE Insulated LSZH Hookup Wire
Rated Voltage: 600V
Rated Temperature: 150ºC
Insulation Material: XLPE
Conductor: Tinned or Bare, Stranded or Solid Copper
Reference Standard: UL758, UL1581, C22.2 No.210
Uniform insulation thickness of wire to ensure easy stripping and cutting.
For internal wiring of electronic and electrical equipment and appliance, PV inverter, new energy, motors, ballasts, solenoids, engine, power modules, etc.
Conductor | Insulation | Max. Cond. Resistance at 20°C (Ω/km) | |||
AWG | Construction (No./mm) | Diameter (mm) | Thickness (mm) | Diameter (mm) | |
30 | 7/0.10 | 0.30 | 0.80 | 1.90 | 381.00 |
28 | 7/0.127 | 0.38 | 0.80 | 1.98 | 239.00 |
26 | 7/0.16 | 0.48 | 0.80 | 2.08 | 150.00 |
24 | 11/0.16 | 0.61 | 0.80 | 2.21 | 94.20 |
22 | 17/0.16 | 0.76 | 0.80 | 2.36 | 59.40 |
20 | 26/0.16 | 0.94 | 0.80 | 2.54 | 37.40 |
18 | 41/0.16 | 1.18 | 0.80 | 2.80 | 23.50 |
16 | 26/0.254 | 1.50 | 0.80 | 3.10 | 14.70 |
14 | 41/0.254 | 1.90 | 0.80 | 3.70 | 9.25 |
12 | 65/0.254 | 2.40 | 0.80 | 4.00 | 5.75 |
10 | 105/0.254 | 3.00 | 0.80 | 4.60 | 3.62 |
8 | 169/0.254 | 3.81 | 1.20 | 6.21 | 2.23 |
6 | 7/38/0.254 | 5.40 | 1.20 | 7.80 | 1.41 |
※The above datasheet is for reference only, please refer to the final specification. |
Q1: Are you a manufacturer?
A1: Yes, we are a manufacturer located in Dongguan, Guangdong, China. We can provide OEM/ODM service for customers around the world.
Q2: Can I get a free sample?
A2: Yes, we can provide the existing items' samples without charge but freight collected. If there is any special samples requirement, please contact us for more details.
Q3: Is the quality of your product guaranteed?
A3: Yes, our workshop are equipped with Brand-new and Advanced Machines and Test Equipment. Besides, our worker are Professional Technicians. Our production process and quality are in strictly accordance with the international standards and customers' requirements.
Q4: What is the order production lead time?
A4: It depends on the quantity and specification. Generally, the order production lead time is around 10-15 working days.